Saturday, 27 October 2012
Final day of filming complete!
Today we finished off the rest of the filming of the music video. It was a day where the British weather really played about continuously changing from sun to rain which at times did prevent us from filming. We started off the day at Greenwich Pier and started off well filming the scene that we needed to. The scenary was as perfect as I remembered from when we visited it on the day we did our recce. After filming finished at Greenwich we made our way to Douglas Path to film the next scene and the location that we needed to film at was isolated and therefore there were no disturbance when filming and we were well on time with the production schedule. We then moved to Millwall park where we needed to film various shots and this was when it started to rain and effect our filming. We decided to get the shots under the bridge done first as it was dry under the bridge and we could film this easily. On our storyboard some of the shots show the actor and actress on the grass messing about but as the grass was wet and we did not want the clothes of our actor and actress to get wet and dirty we had to improvise. We decided that we should do a point of view shot from the male lead and create a home video style recording where the male lead is holding the camera and recording himself and the actress. This proved to work fantastically well as it now gave our music video a new edge and also a different kind of camera shot that we did not intial intend upon but was great as we now added a different element to the music video. We then moved onto the bench scene and again the rain started to slowly pour down but we decided to be persistent and get the scene shot and we managed to do this quickly as possible before the rain got any worse. We then carried on to our last location which was West India Quays and here we filmed the ending sequence which was a lip syching scene on the green bridge and where the main actor burns the photo of the two main characters in the film and walks away. We had trouble lightening up the lighter to burn the photos intially due to the cold weather and so we decided that the main lead should burn part of the photo and then he decides that he can't go through with it and chucks the photo on the floor and walks away. This proved to be easier and worked well. The day was eventful and challenging but we managed to complete the filming of our music video so we as a group were happy. We now move onto post production, editing our music video.
Thursday, 25 October 2012
2nd Team Meeting
Today we held a second team meeting before a second day of shooting tomorrow. Again we had both cast and crew present at the meeting and we went over what scenes need to be done tomorrow and where we will start from. We also made arrangements to meet up at the first location we are shooting at that which is Greenwich. This was a productive meeting as everyone knew what was going to happen at tomorrows shoot and was fully briefed.
Wednesday, 24 October 2012
Production Schedule For Day 2
Production Schedule Sheet
Saturday 27th of October 2012
Location 1: Walthamstow Mall
45 Selborne Road, Greater London E17 7JR
Location Map:
Location 2: Star Nergiz Café
604 Lea
Bridge Road, London E10 7ND
Location Map: http://maps.google.co.uk/maps?hl=en&q=star+nergiz+cafe+lea+bridge+road+leyton+london&um=1&ie=UTF-8&sa=N&tab=wl
Location 3: Greenwich Pier
Royal Borough of Greenwich, London, SE10
Location 4: Millwall Park,
London, E14 3HP
Location 5: Douglas Path
London, E14 3DT
Location 6: West India Quay
Hertsmere road, London E14
EQUIPMENT AND PROPS
Panasonic
Camera – 1
Kodak
HD Zi8 – 1
Tripod
– 1
Lighter
Photographs
Phone
Wallet
N.B spare set of clothing will be required by
for the male lead.
PRODUCTION CREW
Actors
Tyler Dew - 07449310738 – tylerfdew1994@hotmail.co.uk
Charlotte – N/A
10.00 Sayed
and Stephanie meet at mile end station
11.00 Shoot Film
Scenes at Greenwich pier shots 21 to 22
15 .30
Film last scenes of the video at West India Quays shots 30 to 36
Saturday, 20 October 2012
First Day Of Filming
Today we filmed the first half of our music video. It was a day with many events but we successfully finished the first half of our video. To be honest it was a bit ambitious thinking that we would get the whole music video filmed within one day,considering the various locations that we had planned to use in our music video. The day started off at Walthamstow Mall where we shot the first flashback scene of the video. We spent more time then we would have liked at this location but this was due to problems we faced with the photo booth machine that we were using. Nevertheless, we prevailed in successfully filming the shots that we needed and then set off to our second location which was Nergiz Cafe in Leyton. After finishing filming at the cafe the battery of the camera we were using died. We had the charger with us and we all agreed that we should have a lunch break where we could sit down somewhere and charge the camera. We then moved onto the next location which was Stratford and there we had lunch and charged the camera. After the camera was charged we set of to Stratford Bridge. Here we occurred problems as we were planning to film on the bridge we were approached by a member of the Westfeild Stratford shopping centre who told us that we required permission from Westfeild Stratford management to film at the bridge. This was news to us as we were unaware that we required permission to film on the bridge yet Me and Yasmeen went up to the management office to ask for permission to film on the bridge. Once we arrived however the women on the desk told us that authorization takes up to 3 days and we reported this back to the rest of the group and after discussing it with the group we came to the conclusion that we should not film on Stratford bridge and find a new location to film the scene that we needed to. After coming to that agreement we also mutually decided that we should call it a wrap for the day as the day had gone pretty fast and it was past five. We all arranged to meet up next Saturday to finish off the rest of the music video and everyone was happy with that decision. Also the weather was good to us as it luckily did not rain. All in all we faced difficulties but I think we handed them well and every music video has there fair share of challenges. It was a productive day as we got two of locations that we had to film at done. I'm looking forward to next Saturday and continuing with the filming. Bring it on!.
Friday, 19 October 2012
1st Team Meeting
Today we held a meeting consisting of cast and crew. This was fairly important as it gave me the chance to brief the cast and crew of what the plan is for tomorrow. I went over the storyboard with the actor and actress so that they knew the general idea of how we are planning to film the music video and also what is required of them. In this meeting I also handed out production schedules to everyone and we all came to a arrangement of where to meet up tomorrow morning.
Thursday, 18 October 2012
Production Schedule
Production Schedule Sheet
Saturday 20th of October 2012
Working
Title: Take it All Away Music Video
Location 1: Walthamstow Mall
45 Selborne Road, Greater London E17 7JR
Location Map:
Location 2: Star Nergiz Café
604 Lea
Bridge Road, London E10 7ND
Location Map: http://maps.google.co.uk/maps?hl=en&q=star+nergiz+cafe+lea+bridge+road+leyton+london&um=1&ie=UTF-8&sa=N&tab=wl
Location 3: Greenwich Pier
Royal Borough of Greenwich, London, SE10
Location 4: Millwall Park,
London, E14 3HP
Location 5: Douglas Path
London, E14 3DT
Location 6: West India Quay
Hertsmere road, London E14
EQUIPMENT AND PROPS
Panasonic
Camera – 1
Kodak
HD Zi8 – 1
Tripod
– 1
Lighter
Photographs
Phone
Wallet
N.B
spare set of clothing will be required by for the male lead.
PRODUCTION CREW
Stephanie Wong – 07825701737 – steph.wong@hotmail.co.uk
Yasmeen Melius – 07903267976 – yasmeenmelius@gmail.com
Actors
Tyler Dew - 07449310738 – tylerfdew1994@hotmail.co.uk
Charlotte – N/A
|
9.30 Production Crew meets at
Walthamstow Central Station, team briefing takes place making sure all equipment
and props are ready.
10.00 Actors arrive at Walthamstow
Central station.
10.10 Shoot Film Scenes at Walthamstow Mall. Shots of 17
to 19
11.30 Arrive
at Nergiz Café, shoot shots of 11 to 15
12.30 Take train from Leyton
Station to Cutty Sark DLR station.
13.10 Shoot
film scenes of 20 to 22 at Greenwich Pier
13.40 Shoot
scenes at Douglas Path shots 24 to 31
14.30 Lunch
Break
15.00 Shoot
scenes at Millwall Park shots 1 to 10
16.00 Take train from Island
Gardens DLR station to West India Quays DLR station
16.30 Shoot scenes at West
India Quays shots 30 to 35
17.00 Actors
leave
17.30 Production
Crew shoot Cutaways if necessary
18.30 WRAP
|
Risk Assessment
This is the risk assessment form for the South Quay location where we will film at.
This is the risk assessment form Island Garden Park
This is the risk assessment form for the location in Greenwich Martime Museum
This is the risk assessment form the cafe that we will be filming in at Leyton
This is the risk assessment form for Walthamstow Mall
This is the risk assessment form Island Garden Park
This is the risk assessment form for the location in Greenwich Martime Museum
This is the risk assessment form the cafe that we will be filming in at Leyton
This is the risk assessment form for Walthamstow Mall
Wednesday, 17 October 2012
Re-draft of storyboard
This is our updated storyboard which I have created a week after the original first draft of the storyboard, we will use this storyboard as our basis of how to film the music video and will follow it scene by scene.
Tuesday, 16 October 2012
Talent Release Forms
This is the actor in our music video Tyler Dew release form who has given permission to be part of the video.
This is the actress Charlotte Read's Release form who has given permission to take part in the video.
This is the actress Charlotte Read's Release form who has given permission to take part in the video.
Monday, 15 October 2012
Recce
At the start of the music video we are going to use Millwall Park where we film certain flashbacks as well as some lip synching scenes. The park is big and spacious which means that there is a lot of open area that we can film in. The picture on the right shows where we plan to position our actor and actress, they will be lying on the floor looking happily at each other while the camera shows a bird’s eye view shot of the couple together. We will also show a long shot of the stone ball on the top of the mini hill where the actor and actress will be sitting next to and this will provide different and unique scenery to that of many other parks.
Saturday, 13 October 2012
Subscribe to:
Comments (Atom)





